- Moved label-making on A5493 to Millennium. Wrote new procedures and trained staff (11/2006-1/2007).
- Loaded second batch of Naxos records (1/2007).
- Finished transition from telnet to SSH. Made changes to allow continued access to public catalog for screen readers (1/2007).
- Updated Stanton items going from Special Collections to Stacks to Offsite Storage (12/2006-2/2007).
- Trained Archives librarians in creating collection-level marc records in Connexion (2/2007).
- Oversaw LC map shelf-reading and inventory before maps cataloged by Techpro were processed and interfiled (3/2007).
- Held Millennium Login manager training for ILL and Archive's assistants (4/2007).
- IUG 2007 presentation: ArticleReach: Articulating the Development Process (5/2007).
- Coordinate ladd server migration (June 2007).
- Finished work for campus move from FTP to SFTP (June 2007).
- Updated new New Books and monthly lists procedures.
- Set up Secure transfer in Millennium Data Exchange.
- Procedures using WarFTP for percon scanner transfers can remain as they are.
- Wrote load table to create status g score item records as bib records are loaded. Can now have Techpro use recs=bi when whole shipment is scores (7/2007).
- ISBN 13 work: testing and cleanup (8/2007-)
- Set up local systems for CBB new material lists (8/2007-9/2007). (Server level work only completed 2/2008.)
- Catalog redesign (4/2007-9/2007):
- Implemented WebPacPRO, including brief citations for various scopes and ERM records, a new bib record display, and a new resource record display.
- Implemented WebBridge for linking out of catalog, including RefWorks.
- Implemented ERM for A-Z list of Article Indexes.
- Revised Inventory Procedures and Creating Lists using the Portable Barcode Scanner to incorporate new way of uploading records from the B321 percon scanner (9/7/2007).
- Finished term as NExpress System Coordinator; transitioned position to Walter (10/12/2007-10/18/2007).
- Finished 2007 Cancels project (4/2007, 11/2007).
- Collected WebBridge statistics (9/2007-12/2007).
- Started planning for hiring a Library Web and Systems developer (11/2007).
- Established a plan for loading Record Sets (12/2007).